MAINTENANCE SOFTWARE FOR PACKAGING PLANTS

Stop fixing the same jam twice.

The repair notes stay on the job, so every shift starts with what the last one learned. Changeovers follow the same checklist, and the machine that keeps stopping shows up in its own history.

Sign-up is not connected in this preview. Nothing was sent.

Need help? Book a free setup call

  • Free to start
  • No IT team needed
  • Free setup call
A SHIFT IN A PACKAGING PLANT · SAMPLE DATA

WHAT YOU GET

What changes on your line.

The next shift starts where the last one stopped.

Today

The belt on Conveyor 4 slipped on two shifts and nobody told the third.

With Outran

The repair notes and photos stay on the job. The next shift sees what was tried and what is still open.

You see which machine keeps stopping.

Today

The case sealer keeps jamming and nobody counts how often.

With Outran

Every jam is a work order in the case sealer’s history, with the fix, the part and the cost.

Every changeover follows the same checklist.

Today

The changeover settings are on a sheet taped to the machine.

With Outran

Save the changeover as a template with its checklist and start it from the phone each time.

Cleaning and greasing come back by themselves.

Today

The glue nozzles were cleaned last week. Or the week before.

With Outran

Set the clean to repeat every week. It lands on the phone and shows who did it.

BEFORE AND AFTER

From the taped-up sheet and the shift log to one app.

Every job, who has it, what happened and what it cost, in one place.

Before

Too many places to look. Nobody is sure.

With Outran

One place to look. Everybody knows.

Day shift.
Tightened the belt. Still slipping.
One drive belt.
Every jam is in the sealer’s history.

It’s all in Outran.

SAMPLE DATA

TRY IT ON A SAMPLE PLANT

Give Outran a job from your shift.

Type it the way you’d say it on the floor. Outran fills in the machine, the person and the due date.

Try one of these

Your sample work order
TitleCheck the details. Change anything you need.
Leaking oil – Compressor 2
What needs to be done
Compressor 2 is leaking oil. Day technician, today.
Machine
Compressor 2 · Utilities
Machine is
Running with a problem
Assigned to
Day technician
Due
Today
Priority
Normal
Repeat or trigger
Does not repeat
Type
Repair
Categories
Mechanical
Start
Now
Estimated time
Not set
Requests
None linked
Checklist
No steps yet
Parts and costs
Nothing planned
Save as a template
Needs sign-off
Create work order

SAMPLE PLANT · THIS DEMO DOES NOT CREATE A REAL JOB

Questions from packaging plants

We change over several times a shift. Can a changeover be a checklist?

Yes. Photograph your changeover sheet or build it once, save it as a template and start it from the phone at every changeover.

Do we need an IT team or a long setup?

No. Start free and create your first work order yourself. If you want help, book a free setup call and bring your changeover sheets.

Does it work where there is no signal?

Yes, on the phone. The work is saved on the phone and syncs when the signal is back.

Can operators report a jam without learning the app?

Yes. An operator sends a request. A manager accepts it as a work order or declines it, and the operator sees the answer.

Can we show the record to an auditor or a customer?

Yes. Every check keeps who did it and when. Share a work order as a link or a PDF, with its photos and its checklist. Outran keeps the record. It does not certify your plant.

What does it cost?

$0 to start. Paid plans are priced per user, and the Pricing page lists them.

Try it on your next job.

Start free. Or bring your maintenance binder to a free setup call and we set it up with you.